Managing local flood risk through development planning: Statutory consultee support for West Northamptonshire Council
Flood risk management Local authorities

Managing local flood risk through development planning: Statutory consultee support for West Northamptonshire Council

Binnies was appointed by West Northamptonshire Council to deliver all aspects of its LLFA statutory consultee function within the planning system.

Leading coastal resilience at Pevensey Bay
Construction services Flood risk management

Leading coastal resilience at Pevensey Bay

Working alongside the Environment Agency and partners, Binnies provides Principal Designer services.

Llyn Fuches Las Reservoir Safety Improvements
Engineering design Flood risk management Water

Llyn Fuches Las Reservoir Safety Improvements

This project strengthened the reservoir's resilience, protected sensitive habitats and enhanced flood protection for downstream communities.

Everton Water Recycling Centre integrated constructed treatment wetland
Environmental consultancy Water

Everton Water Recycling Centre integrated constructed treatment wetland

Binnies supported the delivery of Anglian Water’s first integrated constructed treatment wetland (ICW) at Everton Water Recycling Centre.

Chemical management upgrades to Lancashire wastewater treatment works
Construction services Engineering design Water

Chemical management upgrades to Lancashire wastewater treatment works

Wastewater treatment works have had new chemical dosing infrastructure installed. The changes will reduce the phosphorus level of effluent.

Additional district cooling system at the Kai Tak Development, Hong Kong
Clean energy Engineering design Water

Additional district cooling system at the Kai Tak Development, Hong Kong

The Kai Tak district cooling system project represents a mega-scale seawater-cooled chiller plant.

Yuen Long Barrage and Nullah Improvement Schemes, Hong Kong
Engineering design Flood risk management

Yuen Long Barrage and Nullah Improvement Schemes, Hong Kong

The Yuen Long Barrage and Nullah Improvement Schemes are part of a landmark flood protection initiative designed to safeguard Yuen Long’s city centre.

Prince of Wales Pier stabilisation and restoration, Polperro Harbour
Construction services Flood risk management

Prince of Wales Pier stabilisation and restoration, Polperro Harbour

Binnies provided design and construction supervision for the stabilisation and restoration of the Prince of Wales Pier,

Delivering sustainable solutions

We’re experts in water, wastewater, flood resilience and environmental projects.

Speak to us today