Project overview

Binnies was involved in an innovative scheme connecting two reservoirs in Hong Kong to mitigate flood risk and save water.

The background

Binnies was contracted by the Hong Kong Special Administrative Region (HKSAR) Government to design and supervise construction of the Inter-reservoirs Transfer Scheme (IRTS). The project consisted of a 2.8-km-long, 3-m-diameter tunnel to transfer water from the Kowloon Byewash Reservoir (KBR) to the Lower Shing Mun Reservoir (LSMR) in Hong Kong.

The concept for this solution came about as an innovative idea in the course of an earlier project, the Lai Chi Kok Transfer Scheme, which was initiated by the Drainage Services Department in 1998. The objective was to formulate a cost-effective solution to resolve the flooding problems in the urbanised area of Lai Chi Kok. The plan for this original scheme was to improve the existing engineered drainage system by intercepting water from the hinterland and upstream areas and directing the run-off into the sea via a tunnel.

As the Lai Chi Kok Transfer Scheme was being worked on, the IRTS was conceived, with the aim of significantly reducing the flow into the drainage system of the Lai Chi Kok area by creating a new transfer tunnel to redirect the overflow from the KBR to the LSMR.

The implementation of the IRTS project would greatly reduce the extent of drainage upgrading works required under the Lai Chi Kok Transfer Scheme in the highly congested urban area of West Kowloon. The IRTS project would also preserve water resources by reducing the KBR’s overflow and diverting the flow back into the reservoir storage system. This would mean that the project would promote sustainability by conserving water resources, while reducing the flood risk.

Challenges and solutions

Challenges Solutions
In the initial stages, some concerns were raised regarding the scheme’s design. The original concept for the intake structure at KBR was a fixed overflow weir set at a level about 0.6 m below the dam spillway level. This meant that the flow would be captured by the IRTS well before reservoir water levels reached the dam overflow level. However, this diversion could cause an overflow of the LSMR, potentially increasing flood risk in the Sha Tin area, located downstream of the reservoir. Another concern was the water-saving nature of the scheme. It was identified that the water saving could be enhanced by allowing flows to be diverted from the KBR to the LSMR in advance. This would create additional spare capacity in KBR prior to the high inflows during rainstorm events. To resolve these issues, the design was modified from a fixed overflow weir to a draw-off chamber with actuated penstock opening to control the flow entering the transfer tunnel. This change allowed full control of the water quantity that is transferred from the KBR to the LSMR, enabling additional spare capacity to be created in the KBR in advance of rainfall events. The design also enables the flow to the LSMR to be stopped if the reservoir is already full and at risk of causing a flood event in the downstream area of Sha Tin. The construction of the IRTS was handled by the Drainage Services Department, while the operation and maintenance of the scheme is carried out by the Water Supplies Department.

The impact

The IRTS project was a highly innovative and strategically important scheme that garnered a high profile throughout its conception and implementation. The scheme has uplifted the flood protection of the West Kowloon area against the more intense and frequent rainstorms expected in the future due to climate change.

In 2022, the project received recognition through the United Nations Sustainable Development Goals Achievement Awards in Hong Kong, gaining a Merit award.